Campo Rubiales

Distributed Energy Supply Contract

29.5 MW installed

Execution Time: Over 8 years


Campo Quifa

Comprehensive Operation & Maintenance Contract for 270 fuel oil-powered generators

Execution Time: 3 years

Rancho Hermoso Field

Centralized Power Generation Contracts

Crude oil treatment with additive technology and wellhead gas-based power generation

3.8 MW installed

Execution Time: 7 years

Nationwide Operations

Global Contract for Distributed Energy Supply

Projects in Development Across Colombia

17.5 MW installed

Over 72 generators installed nationwide

Execution Time: 5 years

Operación A Nivel Nacional

Las Maracas, Kona, Adalia, Begonia, Aguas Blancas, Capachos

Contratos de generación centralizada

8.4mw instalados

Tiempo ejecución: 4 años

Casanare Operations

Pointer, Labrador, Palo Blanco, Canacabare, Tilodiran

Distributed Generation Contracts using crude oil treatment with additives and wellhead gas power generation

4.8 MW installed

Execution Time: 6 years

CPO13 Block – Puerto Gaitán

Development of Pendare Fields

Distributed Power Generation Contracts

5.3 MW installed

Execution Time: 7 years

Southeast Block – Putumayo

Cohembi, Quinde Quillacinga

Distributed Power Generation Contracts

4.8 MW installed

Execution Time: 5 years